LABS & CLEAN ROOMS
Astec Life Science, Navi Mumbai
• Total Sixteenlaboratories that are air-conditioned by Once Through AHUs.
• Two Stage Evaporative cooling units are used to pre cool the supply air & saved @150 TR
• The lab controls are done with help of TEL Controllers & VAVs .
• The area is air-conditioned by 600+ HP VRV system.
• 100 % FRP Construction Scrubbers, Ducts and Dampers are used for negatively pressurized labs to contain chemical fumes inside

Sai Lab, Hyderabad
• Total Sixteenlaboratories that are air-conditioned by Once Through AHUs.
• Two Stage Evaporative cooling units are used to pre cool the supply air & saved @150 TR
• The lab controls are done with help of TEL Controllers & VAVs .
• The area is air-conditioned by 600+ HP VRV system.
• 100 % FRP Construction Scrubbers, Ducts and Dampers are used for negatively pressurized labs to contain chemical fumes inside

Riata Life Sciences, Vadodara
• Total Sixteenlaboratories that are air-conditioned by Once Through AHUs.
• Two Stage Evaporative cooling units are used to pre cool the supply air & saved @150 TR
• The lab controls are done with help of TEL Controllers & VAVs .
• The area is air-conditioned by 600+ HP VRV system.
• 100 % FRP Construction Scrubbers, Ducts and Dampers are used for negatively pressurized labs to contain chemical fumes inside

Unichem, Goa
• Total Sixteenlaboratories that are air-conditioned by Once Through AHUs.
• Two Stage Evaporative cooling units are used to pre cool the supply air & saved @150 TR
• The lab controls are done with help of TEL Controllers & VAVs .
• The area is air-conditioned by 600+ HP VRV system.
• 100 % FRP Construction Scrubbers, Ducts and Dampers are used for negatively pressurized labs to contain chemical fumes inside

The International Rice Research Institute, Varanasi
• Total Sixteenlaboratories that are air-conditioned by Once Through AHUs.
• Two Stage Evaporative cooling units are used to pre cool the supply air & saved @150 TR
• The lab controls are done with help of TEL Controllers & VAVs .
• The area is air-conditioned by 600+ HP VRV system.
• 100 % FRP Construction Scrubbers, Ducts and Dampers are used for negatively pressurized labs to contain chemical fumes inside

International Flavours and Fragrances, Sri City
• Total Sixteenlaboratories that are air-conditioned by Once Through AHUs.
• Two Stage Evaporative cooling units are used to pre cool the supply air & saved @150 TR
• The lab controls are done with help of TEL Controllers & VAVs .
• The area is air-conditioned by 600+ HP VRV system.
• 100 % FRP Construction Scrubbers, Ducts and Dampers are used for negatively pressurized labs to contain chemical fumes inside

Syngene Labs - Hyderabad
• Total Sixteenlaboratories that are air-conditioned by Once Through AHUs.
• Two Stage Evaporative cooling units are used to pre cool the supply air & saved @150 TR
• The lab controls are done with help of TEL Controllers & VAVs .
• The area is air-conditioned by 600+ HP VRV system.
• 100 % FRP Construction Scrubbers, Ducts and Dampers are used for negatively pressurized labs to contain chemical fumes inside


Piramal Healthcare, Mahad
• Total Sixteenlaboratories that are air-conditioned by Once Through AHUs.
• Two Stage Evaporative cooling units are used to pre cool the supply air & saved @150 TR
• The lab controls are done with help of TEL Controllers & VAVs .
• The area is air-conditioned by 600+ HP VRV system.
• 100 % FRP Construction Scrubbers, Ducts and Dampers are used for negatively pressurized labs to contain chemical fumes inside
Homco, Kerala
• Total Sixteenlaboratories that are air-conditioned by Once Through AHUs.
• Two Stage Evaporative cooling units are used to pre cool the supply air & saved @150 TR
• The lab controls are done with help of TEL Controllers & VAVs .
• The area is air-conditioned by 600+ HP VRV system.
• 100 % FRP Construction Scrubbers, Ducts and Dampers are used for negatively pressurized labs to contain chemical fumes inside